Winmarkt - A case study for energy management and BMS at Winmarkt in Romania

Winmarkt Case Study

Our partner Innon completed the installation of a NiagaraAX BMS using WEMS wireless IO at a major shopping centre in Cluj-Napoca, Romania.


Installed to control the major HVAC and lighting plant, Innon installed the system at the three-floor, city centre shopping mall in just five days. The fast installation wasn’t the only benefit, due to the use of our wireless IO, the entire installation resulted in no loss of trading for the shopping mall or their tenant stores.

This case study details:

  • Who are Winmarkt
  • The situation
  • Optimised system
  • Monitoring
  • Rapid installs

 

Share This